GE Industrial Solutions LP 33 Series 30 & 40 kVA Installation Guide User Manual

Page 17

Advertising
background image

Modifications reserved

Page 17/41

OPM_LPS_3UI_30K_40K_0US_V010.doc

Installation Guide LP 33 Series 10-20 kVA

Positioning of the UPS cabinet

LPS33U_

030-040_

UPS whe

els_01US

Dig it al E ne

rgy TM
L P Serie

s

To lower

To lift

Fig. 3.4-5 Bolts for the regulation of the cabinet

LP 33 Series is equipped with wheels for

easy placement of the UPS.

To make the UPS movable on wheels, the

bolts on each leg of the cabinet have to be
turned counter-clockwise, until they are

free from the floor and thus the cabinet
supported on wheels.

After having positioned the UPS at its final
location, the cabinet has to be secured by

rotating the bolts on each leg clockwise,
but the wheels must still touch the floor.



In case of parallel system, try to place

the UPS modules in sequence of their
numbers (marked on the packing).


If the units are positioned “side by side”,
the side panels must be mounted on all

units.

Digital E ne

rgy

T M

LP Se rie

s

LPS33U_

030-040_

RPA disp

osition_G

E_01

Digit al Ene

r gy

TM

L P Series

Dig ital Ener g

y TM
LP Series

Digital E

n ergy

T M

L P Series

1

2

3

4

Fig. 3.4-6 RPA system disposition

Advertising