7 tables – GE Industrial Solutions SG Series UL LISTED BATTERY CABINETS User Manual

Page 16

Advertising
background image

Modifications reserved

Page 17/36

Installation and O&M manual for SG battery cabinets - OPM_SGS_XXU_ISG_BAT_XUS_V020.doc

Installation Guide SG Series UL Battery cabinets

7 TABLES

Table 1. Equipment Weight

Weight - Lbs

Component

Empty

Packed**

Installed**

Battery Cabinet – 27”

420

1600-3400

1500-3300

Battery Cabinet – 44”

550

1730-3530

1630-3430

Transition Cabinet

350

450

**Packed & Installed weight of the battery cabinet varies based on the make and model of the battery used.

Table 2. Battery Cabinet Clearances

From Top of Cabinet

18” for ventilation

From Front of Cabinet

36” working space

From Back of Cabinet

None Required

From Right Side of Cabinet

None Required

From Left Side of Cabinet

None Required

Table 3. Maximum cable size

kVA

Rectifier Input

Bypass Input

DC Input

Output (Load)

Ground

10

#3 AWG

#3 AWG

#3 AWG

#3 AWG

#3 AWG

20

#3 AWG

#3 AWG

#3 AWG

#3 AWG

#3 AWG

30

#1 AWG

#1 AWG

#1 AWG

#1 AWG

#1 AWG

40

#1 AWG

#1 AWG

#1 AWG

#1 AWG

#1 AWG

50

#4/0 AWG

#4/0 AWG

#4/0 AWG

#4/0 AWG

#4/0 AWG

80

#4/0 AWG

#4/0 AWG

#4/0 AWG

#4/0 AWG

#4/0 AWG

100

500 MCM

500 MCM

500 MCM

500 MCM

350 MCM

120

500 MCM

500 MCM

500 MCM

500 MCM

350 MCM

150

500 MCM

500 MCM

500 MCM

500 MCM

350 MCM

225

2x500 MCM

2x500 MCM

2x750 MCM

2x500 MCM

350 MCM

300

2x750 MCM

2x500 MCM

2x750 MCM

2x500 MCM

350 MCM

400

4x500 MCM

2x500 MCM

4x600 MCM

2x500 MCM

350 MCM

500

4x500 MCM

2x500 MCM

4x600 MCM

2x500 MCM

350 MCM

750

5x500 MCM

4x500 MCM

6x600 MCM

4x500 MCM

4x500 MCM

Advertising