GE Industrial Solutions SG Series UL LISTED BATTERY CABINETS User Manual

Page 21

Advertising
background image

Modifications reserved

Page 22/36

Installation and O&M manual for SG battery cabinets - OPM_SGS_XXU_ISG_BAT_XUS_V020.doc

Installation Guide SG Series UL Battery cabinets

FIGURE 4
The cabinets are shipped bolted to a pallet and protected with outer protective packaging material.

Follow below instructions while transporting.

Center of Gravity

PACKAGED UNIT

= =

= =

Advertising