Unpacking bdfb – GE Industrial Solutions BDCBB H569-445 User Manual

Page 10

Advertising
background image

Secondary DC Power Distribution Bay H569-445

Issue 3 June 2012

10

Unpacking BDFB

BDFB’s ship on a 42 by 42 inch skid as shown below. A 15/16 inch wrench or socket is

required to remove 5/8 inch diameter shipping bolts from skid. Before opening the

packaging, carefully inspect the outside in the presence of shipping personnel for signs

of damage. Carefully open the packaging to verify that the contents are complete and

undamaged. If damaged, follow the shipping carrier’s procedure for filing a damage

claim. If the equipment must be returned, repack in the original shipping packaging.
Before continuing, verify that the following conditions exist at the installation site:
• Floor is conditioned and clean (refers to removal of any combustible flooring, e.g.,

carpet, wood, etc.).

• Job Site Documentation details cabinet locations.

Figure 1 Cabinet Shipping Pallet

Advertising