Unpacking mounting hardware – GE Industrial Solutions BDCBB H569-445 User Manual

Page 11

Advertising
background image

Secondary DC Power Distribution Bay H569-445

Issue 3 June 2012

11

Unpacking Mounting Hardware

Hardware for making all cabled connections is included with the BDFB. 3/8 inch

hardware for Input Load Bus connections is installed on the Load Shunt and Load Return

Bus Details as shown in section 9. CC408576210 ¼ inch conical nuts are provided for all

output load and return connections. These nuts are located in the hardware box as

shown below.

Figure 2 Hardware Box Location

Advertising