Secondary DC Power Distribution Bay H569-445
Issue 3 June 2012
11
Unpacking Mounting Hardware
Hardware for making all cabled connections is included with the BDFB. 3/8 inch
hardware for Input Load Bus connections is installed on the Load Shunt and Load Return
Bus Details as shown in section 9. CC408576210 ¼ inch conical nuts are provided for all
output load and return connections. These nuts are located in the hardware box as
shown below.
Figure 2 Hardware Box Location