GE Industrial Solutions BDCBB H569-445 User Manual

Page 26

Advertising
background image

Secondary DC Power Distribution Bay H569-445

Issue 3 June 2012

26

circuit wiring from the VIM is redressed in the field this feature can be used to assign the
appropriate circuit to the new load location.

Item

Control and

Operations

Parameters

Description

18

Start Lamp Test

Cycles the illumination of the front panel LED and Backlight through Red, Amber, and
Green

19

Clear Latched Events

Clears a latched Overload Alarm event. Note the Overload Latched Event must be enabled
to have a latched alarm.

20

Start Alarm Test

Asserts Form-C alarms available at connector J3 in a fixed sequence: Fuse Alarm (FA),
Power Loss (PL), and Overload (OVL). Alarm asserted is displayed on the front panel.
Feature can be used to test the site’s remote monitoring systems and wiring.

Basic items to configure in a -48V meter retrofit or replacement

Use the previous VIM1C menu map and table as a reference to configure the basic items

listed below:

Configure the Number Of Loads present in the BDFB (Item 5)

Set the display Meter Type (Item 6)

Configure the Load ID Format presented on the display (Item 7)

Set the position of the First Load Location (Item 8)

Configure the Shunt Rating of each monitored load in amps (Item 9)

Set the state of each load as installed or not installed at Load Available (Item

12)

Set the local audible alarm indicator capability at Local Buzzer (Item 2)

Advertising