Side views – John Wood Commercial - 300-400K BTU User Manual

Page 9

Advertising
background image

9

circuit board, the control system’s LCD display and

operational buttons. used to adjust various user settings and

view operational information. See Control System Operation

on page 41.

11. Temperature-Pressure relief Valve. See Temperature-

Pressure relief Valve on page 15.

12. Temperature-Pressure relief Valve discharge pipe - see T&P

Valve Discharge Pipe requirements: on page 15.

13. Lower Temperature Probe, 1 of 2 temperature probes. The

water heater’s control system monitors this probe to detect

water temperature in the lower portion of the storage tank.

14. Water inlet pipe - 1 1/2” NPT connection.
15. Water heater drain valve.
16. Combustion blower.
17. Vent connection (exhaust elbow) - 4 inch PVC.
18. Condensate trap with 1/2 inch PVC drain connection. See

Figure 9 on page 16 and Condensate Drain Installation on

page 35.

side Views

1. Cleanout access panel, covers water heater cleanout

opening.

2. CCb enclosure - see Figure 3 on page 8 for description.
3. 120 VAC junction box. Incoming power supply and ground

connections are made here - see requirements for Power

Supply on page 13.

4. Intake air connection - 4 inch PVC.
5. Supply gas line connection. See Supply gas Line on page 13.
6. Low gas Pressure switch, see description under Figure 3 on

page 8. See Table 3 and the gas Pressure requirements

on page 13.

7. Water heater 24 VAC gas Valve.
8. Water outlet pipe - 1 1/2” NPT connection.
9. VFD (variable frequency drive) blower motor drive - - see

Figure 3 on page 8 for description.

10. uIM (user interface module). The uIM includes the display

10

8

16

2

7

6

5

11

12

17

18

13

14

15

RIGHT SIDE

11

12

14

15

13

3

2

1

4

5

6

7

8

9

10

LEFT SIDE

figure 4

figure 5

Advertising