Step 8: create a display shutdown schedule, Step 8 : create a display shutdown schedule, System 5 ip software setup, cont’d – Extron Electronics System 5 IP Series Setup Guide User Manual

Page 24: Step 8 : create a dsplay shutdown schedule

Advertising
background image

System 5 IP Switchers • Software Setup

System 5 IP Software Setup, cont’d

3-18

System 5 IP Switchers • Software Setup

3-19

5.

In the upper left corner drop-down menu (under

DVD & VCR Control

), select Input 4, as illustrated below.

This assigns the input button (Input 4) to activate the

IRCM-DV+ [DVD] control panel.

Input 4 button selection

6

.

Click the Auto Fill button.

N

To use the Auto Fill feature, an applicable IR driver must

be present.

A dialog box appears.

Control module configuration

7

.

From the Auto Fill Dual-Function DVD and VCR IR

Control Module

dialog box, select the Hitachi DV-PF7E

DVD/VCR

IR driver. All functions for the selected driver

appear in the right side pane of the dialog box.

8

.

Select Port A from the bottom portion of the dialog box.

9

.

Click the OK button. The dialog box closes.

All commands that match a button on the module are

assigned to that button. Red triangles on the buttons of the

control module indicate that all the matching buttons have

been auto-filled.

10

. To configure Address 2 IRCM-DV+[VCR], repeat steps 1

through 9, substituting Address 2 for Address 1.

N

In step 5, you will need to select a different input button in

the VCR half of the control module.

N

If using an IRCM-DV+, you must associate each half with

an input.

Step 8: Create a Dsplay Shutdown Schedule

Global Configurator’s scheduling feature enables you to

schedule actions and events for a selected device. Scheduling

is often useful for setting a projector or other device to shut

down or turn on at a predetermined time (e.g., in a school, all

projectors can be set to power off at 5:00 P.M.).
To schedule a display shutdown:
1

.

Click on the Schedule tab in the Global Configurator

window.

2

.

Click the Add Schedule button below the Scheduled

Actions

window. The Scheduled Actions Wizard dialog

box appears, as shown below.

Scheduled Actions Wizard

Advertising