Schreiber Chillers 1055AC/RC HANDBOOK User Manual

Page 16

Advertising
background image

Cryo Compressor Pump

The pump cryo compressor pump is a positive displacement pump capable of delivering 4 GPM. This

flow rate is constant under all conditions. The discharge pressure will vary according to the length of

pipe and the number of fittings in the pipe system. A T-handle pressure relief valve allows adjustment

of the discharge pressure. It should be set to no more than 50 psi.

The cryo compressor pump motor is EXTERNALLY overload protected. In the event of overload,

pump will shut down, and a “CIRCUIT #2 FLOW” alarm will be generated. The overload will

automatically reset, however, the controller flow alarm must be reset.

GCHE/GAHE Pump

The GCHE pump is a 1 HP centrifugal pump. There is a ball valve that short circuits the discharge

and return valve to allow for flow adjustment. The ball valve should be opened so that there is no

more than 35 psi difference between the discharge and return pressure readings for the GCHE

pump. If the pressure is to high, the valve must be opened to divert flow. If it is too low and the not

enough water is going to the GCHE, it must be closed. In order to properly set the valve position, the

adjustments should be made when during a scan when the MR equipment is putting the full heat load

into the chilled water system.

All of the bypassed water returns to the reservoir through the evaporators. The return line water is

diverted to both evaporators.

The pump motor is INTERNALLY overload protected. In the case of an overload the pump will shut

off. The controller will show a “CIRCUIT #1 Flow” error. When the alarm is reset, the pump will restart

if the motor has cooled down to the point where the overload is closed. If the overload is still open,

the controller will try to restart the pump, but will generate another flow error after the pump start up

time delay.

Any time the flow error is reset, the compressors will turn on automatically if cooling is required.

A wye strainer is installed in the return line to prevent the evaporators from fouling. If there is a

noticeable drop in flow, the wye strainer may be full. It can be cleaned by opening the cleanout valve

on the front of the chiller. This must be done while the pump is running. A small bucket should be

place under the valve to catch debris and water that will l=come out of the valve. The valve only

needs to be open for a few seconds.

Chilled Water Reservoir

The insulated chilled water reservoir inside the chiller is designed to eliminate wide swings in

temperature during changing loads. It also provides a convenient location from adding water and

glycol to the system.

A float in the reservoir tells the controller that the water level is too low. The low lever alarm still

Advertising