Model mt 3810 – Brooks Instrument MT3810 User Manual

Page 39

Advertising
background image

3-1

Installation and Operation Manual
X-VA-MT3810-eng
Part Number: 541B050AHG
December, 2008

Model MT 3810

Section 3 Operation

3-1 Pre-Start Check

After the flowmeter has been properly installed in the process, it is ready
for operation. When initiating flow, slowly open the valve to avoid a flow
surge.Bypass is a help in bringing the flow on smoothly. Avoid starting a
pump to supply the flowmeter without the use of a valve upstream of the
flowmeter

At no flow condition the indicator pointer should align with the “0” mark on
the scale. If necessary, adjust the pointer as per directions in the Mainte-
nance Section 4-3.

3-2 Start-Up and Operation of Flowmeter

a. Slowly initiate flow into the system. Open process valves slowly to avoid

flow surges.

b. Check for leaks around the meter inlet and outlet connections. If no

leaks are present, bring the system up to operating pressure.

3-3 Operation of the Model MT 3810 Flowmeter with a Smart Meter Manager Transmitter

with or without Optional Alarms and Pulse Output for totalization

a. Start-up the meter as described in Section 3-2.
b. Programming performed prior to shipment (parameters)

The SMM transmitter with or without alarms and pulse output is
preprogrammed prior to shipment for the following parameters based
on the order information, meter configuration and application.
If parameters are not specified in the customer purchase order, the
defaults inherent to the electronics will be as shown in (parenthesis).

Advertising