Reconnecting pump head to feed rate – Hydrotech Classic Series Stenner Basic Service Manual User Manual

Page 13

Advertising
background image

12 Separating & Reconnecting Subassemblies

1. Put the pump head (with main shaft) into the feed rate

control and turn it counterclockwise until the shaft falls
into place.

2. Push the pump head (toward the feed rate), while turning it

counterclockwise, to line up the rivet holes on the pump
head with the rivets on the feed rate control.

3. Continue to push until the rivets are inside the holes and

the snap lock engages.

4. Turn the pump head counterclockwise to secure the rivets

in the rivet slots, firmly attaching the pump head.

Reconnecting Pump Head to Feed Rate

NOTE

Additional information

Tubes must be horizontal
when completed.

Advertising