1) If using a multi-speed pump, run pump for at
least 6 hours per day at high speed (at least 40
gpm).

If the pump will run on low speed 24
hours per day or less than 6 hours per
day on high speed, you must bleed the
air while the pump is on by unscrewing
the cap knob until water appears. Then
screw the knob back on. Repeat this
process each time the cap is removed
for any reason.

2) Install system with 4-8 psi back pressure.

Lower back pressures could result
in under chlorination. Adjust eye ball
fittings in the return jets to a smaller
size to increase back pressure. Contact
King Technology at 800-222-0169 for
a cap tapped for a pressure gauge to
determine back pressure at pool start-up.

3) Special installation:

• If water flow is higher than 80 gpm, see
diagram A.

• If an in-floor cleaner is included with pool,

see diagram B, with two options. Preferred
installation is Option 1 with two separate lines.

• If set-up is a pool and spa combination with
common equipment, see diagram C.

• Any additional sanitizing equipment that is installed
with New Water® must be installed after New
Water® (never before) on the return line to the pool.

NOTE: Over chlorination or damage to the New
Water® Cycler or other equipment could result if these
special installations are not used in these situations.

A. With High GPMS

Install T-fittings exactly as shown.

C. Pool and Spillover Spa Combination

B. With In-Floor Cleaner - TWO OPTIONS

PUMP

PUMP

POOL WATER LEVEL

POOL WATER LEVEL

Flow

Flow

HEATER

The best option is to have two lines. One line with pump, filter, heater
and cycler and a second line with a separate pump for the in-floor clean-
ing system (filter optional).

OPTION 1- A Two-Line Installation

OPTION 2 - A 3-Way Valve Installation

POOL WATER LEVEL

POOL WATER LEVEL

POOL WATER LEVEL

POOL RETURN

3-way manual valve or 3-way motor valve plus controls

New Water®
CYCLER

New Water®
CYCLER

IN-FLOOR
CLEANER VALVE

IN-FLOOR
CLEANER VALVE

Line 1

Line 2

TO

POOL

CYCLER

CHECK

VALVE

SUCTION

FROM

POOL/SPA

T O POOL

T O SP

A

3-WAY VALVE

CYCLER

CHECK VALVE

PUMP

SUCTION

FROM

POOL/SPA