9 power-up and testing, 1 before applying power, 2 power application – Cleveland Motion Controls ULTRA ISC SERIES SLIM CELL TRANSDUCER REV AA User Manual

Page 33: Ower, Up and, Esting

Advertising
background image

MAN-70434-0

R

EV

AA

U

LTRA

ISC

S

ERIES

S

LIM

C

ELL

T

RANSDUCER

4.9 P

OWER

-

UP AND

T

ESTING

4.9.1 B

EFORE

A

PPLYING

P

OWER

Before applying power, check the wiring to the amplifier. Pay particular attention to the following:

 Double check the transducer cabling to ensure that the 24V power supply is within limits

and polarity is correct.

 Use an approved anti-static wrist strap when adjusting any potentiometers on the amplifier.
 Use the appropriate tool when making any adjustments to the potentiometers on the

amplifier. Damage to the circuitry may occur if excessive force is used or a conductive tool
accidentally contacts internal voltages.

4.9.2 P

OWER

A

PPLICATION

As soon as practical after connecting power to the ISC, verify that the 24 VDC supply is
operational and not overloaded by any mis-wiring.

Use a DC voltmeter to confirm that the supply

polarity is correct and that the voltage is within the prescribed limits. Promptly identifying any
over-voltage condition can help minimize potential damage to the circuitry internal to the
transducer.

With 24 VDC supply confirmed, check the DC output voltage reported by the ISC and see if it
responds as expected when small test forces are applied to the Tension Transducer.

P

AGE

33

OF

42

Advertising