1.0

QuickStart Installation

The QuickStart Installation procedures provide the key
steps for mounting, wiring, and configuring the Eclipse

®

level transmitter. These procedures are intended for experi-
enced installers of electronic level measurement instruments.
See Complete Installation, Section 2.0, for detailed installa-
tion instructions.

WARNING: The Model 7xD, 7xG, 7xR or 7xT overfill probes should

be used for Safety Shutdown/Overfill applications. All
other Guided Wave Radar probes should be installed so
the maximum overfill level is a minimum of 6" (150 mm)
below the process connection. This may include utilizing
a nozzle or spool piece to raise the probe. Consult fac-
tory to ensure proper installation.

1.1

Getting Started

Before beginning the QuickStart Installation procedures,
have the proper equipment, tools, and information available.

1.1.1 Equipment and Tools

• Open-end wrenches or adjustable wrench to fit the

process connection size and type. Coaxial probe 1

1

2

"

(38 mm), twin rod probe 1

7

8

" (47 mm), transmitter

1

1

2

" (38 mm). A torque wrench is highly desirable.

• Flat-blade screwdriver
• Cable cutter and

3

32

" (2.5 mm) hex wrench

(Flexible probes only)

• Digital multimeter or digital volt/ammeter
• 24 VDC power supply, 23 mA minimum

4

57-600 Eclipse

®

Guided Wave Radar Transmitter