American Panel Blast Chiller BCIP User Manual

Page 11

Advertising
background image

INSTALLATION

9


COLOR CODE CHART

PLUG/CONNECTOR

COLOR

PLUG/CONNECTOR DESTINATION

CABLE/WIRE

TYPE

QUICK-CONNECT (PLUG-CONNECTOR) CABLES

BLUE FANS

SOOW

YELLOW DEFROST

HEATERS

SOOW

GRAY SOLENOID

VALVE

SOOW

WHITE INTERIOR

LIGHT SOOW

GREEN UV

LIGHT

SOOW

BROWN

DOOR SWITCH

SOOW / WIRE

ORANGE

DOOR / WINDOW HEATERS

SOOW / CONN. BOX

RTD (FOOD, AIR & DEFROST) PROBES (GREY WIRE)

GREEN

PRODUCT PROBE

THERMOCOUPLE (OPTIONAL)

BLUE PRODUCT

PROBE

THERMOCOUPLE (OPTIONAL)

YELLOW PRODUCT

PROBE THERMOCOUPLE (OPTIONAL)

RED

PRODUCT PROBE

THERMOCOUPLE (STANDARD)

BROWN AIR

PROBE

THERMOCOUPLE (STANDARD)

WHITE DEFROST

PROBE

THERMOCOUPLE (STANDARD)

DRAWING #6

NOTE: Route the micro-switch (B) wires through the wall and bring them inside the box at approx. 6” above
the door. Insulate the wall hole (s) with silicone or grommets. Take precaution to protect the heater wires
inside the door frame.

Advertising