INSTALLATION

16

The specified piping diameters (see chart below) from the remote condensing unit to the cabinet is adequate for a

separation of up to 60 feet. For greater distances, contact the factory for instructions.

Diameter of Copper Piping

Supply Line

½”

Intake Line

1 1/8”


**Note: The insulation used on the piping must be of high quality and must have

closed cells.

CONDENSATE DRAINAGE CONNECTION

It is important that condense from the evaporator is properly drained. The drain line from the evaporator exits from

the side of the front cabinet. It must be connected in conformance with local regulations.

VERIFYING CORRECT INSTALLATION

1. Check that there are no refrigerant leaks from welds and joints that were done during the installation.
2. Check that the refrigerant piping is insulated fully and correctly.
3. Check all electrical connections.
4. Check the provision for drainage of condense.
5. Check that the electrical supply is the correct voltage (within

± 5%), phase and size per the nameplate.