I) cabinet, Ii) air cooled, C. refrigeration unit installation – American Panel Blast Chiller BCIP User Manual

Page 15: C.1. preparation c.2. find the location

Advertising
background image

INSTALLATION

13

PHOTO #9

C. Refrigeration Unit Installation

C.1. Preparation

9 Check the integrity of the unit once it is unpacked
9 Check to make sure the floor is leveled
9 Check that the available power supply corresponds to the ratings on the unit’s nameplates and correctly rated

electrical protection is provided.

9 If additional refrigerant should be needed, be certain to use the correct type.
9 Make certain that adequate drainage is provided.
9 If a remote condensing unit is used, be certain that it is positioned within the range indicated in this manual and that it

is connected as specified and in accordance with all applicable electrical codes.


C.2. Find The Location

Ambient air temperature for air-cooled condensing units must be no greater than 95

° F to ensure the rated performance.

The condensing unit must be located away from direct sunlight if installed outdoors; or, if it is indoors, it should be in an
appropriate room in which air change is guaranteed to be no less than 318,000 cubic feet per hour.

SPECIFICATIONS TO USE DURING INSTALLATION:

i)

CABINET

AP40BC250-12
BCCP-1

AP40BC250-2-12
BCCP-2, BCIP

ii)

AIR COOLED

REMOTE CONDENSING UNIT
(4HP)(OPTIONAL)

Voltage 120/208V

120-208V

208V

Phases 1

1

3

Amperage 10

20

20

Circuit size

15

30

30

Power supply cable

12-4

10-4

10-4



Note: The condensing unit and the cabinet must be connected to separate

Advertising