IAI America SEP-PT User Manual

Page 149

Advertising
background image

143

5.2.8 Maintenance,

I/O

Test


I/O Test can be performed.

Touch Maintenance in MEC MENU window.








Touch the I/O Test.

When MENU is touched, the MEC MENU window is
returned.




x I/O Test : The PIO input signals can be monitored.

Also, for the output signals, touching OUT0, OUT1, OUT2 or OUT3 turns

ON and OFF the corresponding signal forcibly.

The ON and OFF of the input signals can be monitored.

For the output signals OUT0 to OUT3, touching the button
outputs the corresponding signal forcibly.


When MENU is touched, the MEC MENU window is
returned.






Advertising