Vanguard TTRA-S2 (ATRT-03 S2, ATRT-03A S2, ATRT-03B S2, Tri-Phase) User Manual

Page 42

Advertising
background image

TTRA-S2 VERSION 1.x SOFTWARE MANUAL

REV 2

39

6. Click on the “OK” button. An untitled test plan with the selected parameters will be

created and displayed as shown below:

7. Enter the header information in the corresponding input fields.

8. Select the voltage regulator type from the “Type:” drown-down list. If applicable, select

the group from the “Group:” drop-down list.

9. Enter the maximum deviation percentage in the “Max Dev. %” input field.

10. Select the test voltage from the “Voltage:” drop-down list.

11. Save the test plan (see section 5.4).

Advertising