Vanguard CT-6500 S2 User Manual

Page 27

Advertising
background image

CT-6500 Series 2 Operating Instructions

26

9.0 Operating Procedures

The main steps to time a circuit breaker are listed in Figure 10.0.


.























Figure 10.0 CT-6500 Operating Steps


NOTE

To reduce the possibility of damaging the CT-6500 contact channels due to static
discharge in high voltage substations, it is recommend to ground one side of the
breaker’s bushings.
Always connect the CT-6500 ground stud to the substation ground before
connecting any cables to the unit.

HOOKUP CT-6500
1. GROUND THE CT-6500 (See NOTE)
2. CONNECT CT-6500 CABLES TO BREAKER
3. INSTALL TRANSDUCER WITH CABLE

APPLY POWER

1. TURN THE CT-6500 ON
2. PERFORM SELF TESTS: HOOK-UP TEST,
CABLE TEST, IF NECESSARY

TIME BREAKER
1. SELECT THE CT-6500 TEST
2. OPERATE THE BREAKER

GET RESULTS
1. READ OR PRINT THE TABULATED RESULTS
2. PRINT THE GRAPHICAL RESULTS
3. SAVE THE TIMING SHOT

Advertising