Multi-path LUN configuration example

Figure 93

on page 199 shows a single LUN on a dual-port target that is accessed over two paths by

a dual-port host. The two encryption switches form an encryption group and an HA cluster. The
following example illustrates a simplified version of a multi-path LUN configuration.

FIGURE 93

A LUN accessible through multiple paths

The following steps may be used to configure multiple path access to the LUN in

Figure 93

.

1. Create zoning between host port 1 and target port 1. Refer to the section

“Creating an initiator

- target zone”

on page 158 for instructions.

2. Create zoning between host port 2 and target port 2. Refer to the section

“Creating an initiator

- target zone”

on page 158 for instructions.

3. On the group leader encryption switch (switch 1), create a CryptoTarget container for each

target port and add the hosts in sequence. Do NOT commit the configuration until you have
created all CryptoTarget containers and added all hosts to the respective containers.

a. Create a CryptoTarget container (CTC1) for target port 1 to be hosted on the encryption

engine of encryption switch 1. Refer to the section

“Creating a CryptoTarget container”

on

page 162 for instructions on steps b. through e.

FabricAdmin:switch> cryptocfg --create -container disk CTC1 \

<switch 1 WWN> 0 <Target Port 1 WWN> <Target NWWN>