Wall mount procedure - new installation – Brocade Mobility 1240 Access Point Installation Guide User Manual

Page 16

Advertising
background image

Wall mount instructions

2

12

Brocade Mobility 1240 Access Point Installation Guide

53-1002917-01

Wall mount procedure - new installation

This section describes a new Mobility 1240 Access Point installation with no
previous access point existing on the intended wall surface.

1. Place the access point against the wall, ensuring the access point’s logo is in

the correct orientation.

2. Mark the screw hole locations 152mm (6 in.) apart on the access point’s long

axis or 40mm (1.57 in.) apart on the access point’s short axis, depending on
the intended deployment orientation of the unit.

3. At each point, drill a hole in the wall and insert the anchor.

NOTE

When pre-drilling a hole the recommended hole size is 4mm (0.16in.).

4. Place the access point on the anchor. Insert screws through into the anchor.

5. If required, install and attach a Kensington security cable (customer supplied)

to the unit’s lock port.

6. Cable the access point using either power over Ethernet or the approved

Mobility 1240 power supply (PWRS-14000-247R).

For power over Ethernet installations:

a. Connect a RJ-45 CAT5e (or CAT6) Ethernet cable between the power over

Ethernet switch port and the access point’s GE1/POE port.

b. Ensure the cable length from the Ethernet source (host) to the power over

Ethernet and access point does not exceed 100 meters (333 ft).

For standard power adapter (non power over Ethernet) and line cord
installations:

a. Connect a RJ-45 Ethernet cable between the network data supply (host)

and the access point’s GE1/POE or GE2 port.

b. Verify the power adapter is correctly rated according to the country of

operation.

c. Connect the power supply line cord to the power adapter.

d. Attach the power adapter cable into the power connector on the access

point.

Advertising