Triton FT5000 Installation Manual User Manual

Page 6

Advertising
background image

6

FT5000 - S

ITE

P

REPARATION

AND

I

NSTALLATION

G

UIDE

What’s in This Installation Guide

This Installation Guide provides information for the preparation and installation of
the FT5000 ATM. It contains requirements for site preparation, electrical specifica-
tions, and cabinet accessibility that comply with all relevant codes, laws and regu-

lations. The Installation Guide is divided into the following sections:

†

Introduction. Summarizes the basic steps that must be completed to physically
install a FT5000 ATM. Configuration of operating parameters is not covered!
Refer to the applicable Configuration and/or Service Manual for instructions
on configuring the operating parameters.

†

ATM Installation for Accessibility. Describes the basic Americans with
Disabilities Act (ADA) requirements for ATM location and access. Note: These
are the general requirements that should be applicable to most installation
locations. Please verify the specific requirements with the state where the
ATM is to be installed, prior to installation. For state contact information, you
may call the ADA information line at 1-800-514-0301.

†

ATM Environmental Precautions Checklist. Describes the general
environmental precautions considered when installing the ATM. To help ensure
proper operation of the ATM, ensure the environmental criteria listed in this
checklist are met.

†

Site Preparation/Installation. Describes site preparation for exterior wall or
vestibule locations. Instructions provide dimensions/clearances needed to
install the FT5000 and procedures for installing the cabinet and front fascia.
NEW - Optional platforms (“plinths”) available in 2 sizes expediate raising
the unit, if needed. [ P/N 06100-00071 (2-3/8") and P/N 06100-00072 (4-
3/4")] Also, cabinets now come with their own leveling feet
.

†

Power and Communication. Describes how to connect the ATM to the facility
power and telephone connections.

†

Dispensing Mechanism Installation. Describes how to install/remove the
dispensing mechanism into the ATM security cabinet.

†

Installing the Rear Service Panel (RSP). Describes how to install and connect
the RSP to the cabinet sleeve.

†

TCP/IP (Ethernet) Cable Installation. Describes where to install the
10Base-T CAT-5 cable for Ethernet communication.

†

VSAT Cable Installation. Describes where to install the optional VSAT cable.

Advertising