HT instruments HT7052 User Manual

Page 26

Advertising
background image

HT7052

EN - 24

Fig. 33: Connection of instrument for diagnostic test

5. Press START/STOP key to activate the insulation measurement
6. Wait for the end of the set Timers. The result of test is shown at display (see Fig. 30 or

Fig. 32) with meaning of items descript in Table 6

7. Wait for the object under test to discharge
8. For saving the result see § 7

Parameter at display

Description

Fil0 (Fil1, Fil2, Fil3)

Filter type enabled on test (see § 6.3)

5000V

Set test voltage – step 25 V

U=5295V

Applied test voltage

I=55.6nA

Applied test current

95.1G

Result of insulation measurement

C=2.1nF Capacitance

of measured object

Bargraph Analogue

representation of Riso result

R15sec=95.0G

Resistance value measured after set time 1

R01min=95.1G

Resistance value measured after set time 2

R10min=95.1G

Resistance value measured after set time 3

DAR=1.00

DAR as ratio of R1min / R15s

PI=1.00

PI as ratio of R10min/R1min

DD= DD

result

Table 6: Meaning of parameters of diagnostic test

CAUTION

 A high-voltage warning symbol appears on the display during the

measurement to warn the operator of a potentially dangerous test voltage

 The value of the capacitance is measured during the final discharge of the

test object

 If enabled, the instrument measures Dielectric Discharge (DD) when the

capacitance is in the range 5nF

50F

Advertising