Install the pump, Prepare the flow cell – In-Situ smarTROLL Multiparameter Handheld Operators Manual User Manual

Page 64

Advertising
background image

64

17. If you would like to save the test set up information as a template to use again later,

tap the Save button. You can save it using the default name, or tap the field and
enter a new name.

Install the Pump

1. Determine the static water level.

2. Install the pump in the well.

3. Start the pump and determine the optimum final pumping rate and final stabilized

drawdown from static water level. This can be calculated using a graduated
cylinder, stopwatch, and water level tape.

Prepare the Flow Cell

1. Select the barbed NPT fitting that will fit with the tubing size.

2. Tape the threads with plumbing tape.

3. Attach a fitting to the inflow port at base of the cylinder and to the outflow port at the

top of the cylinder. Tighten until hand-tight. Do not tighten with a wrench.

The 3-way valve and check valve are optional.

4. Attach the tubing.

5. Use the attachment screw to connect the flow cell to the base plate.

6. Insert the calibrated

SMAR

TROLL™ MP Instrument.

Advertising
This manual is related to the following products: