Unit lifting, Installation data – Airedale Air Cooled Condensers R410A User Manual

Page 10

Advertising
background image

CR12

– CR105

Condensers

10

Condensers

Installation & Maintenance : 6680953 V1.2.0 02/2013

Installation Data

UNIT LIFTING

General

Employ lifting specialists

Local codes and regulations relating to the lifting of this type of equipment should
be observed

Each chain/sling must be capable of lifting the whole unit

Lift the unit slowly and evenly

IMPORTANT

Only use lifting points provided.

Do not use 1 chain between 2 lifting points to avoid load shift.

Ensure that chains/slings DO NOT crush the casework, coil or fan assemblies.

If the unit is dropped it should immediately be checked for damage and reported
to Airedale.

Airedale will accept no responsibility for mishandling during the positioning of
the equipment.

CAUTION

Check the unit is as ordered, discrepancies or transit damage should be reported
to Airedale immediately.

Horizontal Air Discharge

The unit is delivered in horizontal air discharge configuration secured to a pallet. Where
possible the unit should be moved with the pallet in place.

Use 4 lifting eyes attached to 4 individual slings/chains
(supplied by others) and attach 2 to each top leg using
the holes provided as illustrated.

Vertical Air Discharge

The unit is delivered in horizontal air discharge configuration (with the mains isolator and
fan speed controller already configured for vertical air discharge) secured to a pallet.
Where possible the unit should be moved with the pallet in place.

Before lifting into final position, the unit legs should be re-orientated, refer to

Re-

orientation to Vertical Discharge

, on page 11

CAUTION

Care should be taken to ensure the unit does not sustain damage before it is lifted
into final position.

> 60°

Use 4 lifting eyes attached to 4 individual slings/chains
(supplied by others) and attach 1 to the top of each of the
4 corner legs using the holes provided as illustrated.