Condensing units, Maintenance requirements – Airedale Condensing Units (CU) 3kW - 80kW User Manual

Page 26

Advertising
background image

CUS 15 - 60 / HCU 20 – 30D

Condensing Units

Chiller & Condensing Units

Installation & Maintenance:Part No: 6259592 IM 07\14

26

Maintenance Requirements

CABINET

Wash down cabinet using a mild detergent. Treat any paint damage or rust as
necessary.

ELECTRICAL

1

Check all electrical connections for signs of overheating or arcing.

2

Check all cables for signs of chafing or physical damage.

SERVICE CHECKS -
YEARLY

As three-monthly plus the following:-
1

Check all electrical connections for tightness.

2

Check all refrigeration connections with leak detector.