Complete the installation – Badger Meter ORION AMR/AMI Hardware Solutions for Gas Utilities User Manual

Page 13

Advertising
background image

Installation Manual

COMPLETE THE INSTALLATION

After programming, add seal caps to the front and rear screws of the index cover plate Only the front screw is shown below

Figure 18: Add seal caps on index cover plate

If the index mounting seal caps were removed, replace them with the extra caps provided in the installation kit

Figure 19: Replace seal caps on index mounting

This completes the installation of an ORION integral endpoint on an American Commercial Diaphragm and Turbine Meter

with Wire Seal Security Screw converted to seal caps

Page 13

July 2014

Advertising
This manual is related to the following products: