Program the orion integral endpoint, Program the orion integral endpoint 17, Mportant i – Badger Meter ORION AMR/AMI Hardware Solutions for Gas Utilities User Manual

Page 17

Advertising
background image

Installation Manual

2 When mounting an ORION integral endpoint to a gas meter make sure the endpoint drive pawl engages the gas meter

drive pawl These two drive pawls must mate without causing any binding or potential for disengagement Test to ensure

the pawls are engaged and moving freely

MPORTANT

I

Placing endpoint on meter incorrectly may damage the output seal of the gas meter

Endpoint drive pawl

Meter drive pawl

Figure 28: Mate drive pawls of endpoint and meter

3 Be sure the gas INLET markings are on the same side of the meter and the lens faces forward See

Figure 29

Gas inlet markings

Lens facing forward

to front of meter

Figure 29: Inlet markings on same side of meter

4 Place the American index and cover plate (removed earlier) back on the ORION integral endpoint Place it so the text

TURBINE FRONT FLOW AL-600, AL-1000, AL-1400, AL-2300, and AL-5000 (or other such text) faces the front and the index

hole is centered around the endpoint drive pawl Place the index drive pawl perpendicular to the endpoint drive pawl

Index drive

pawl

Figure 30: Index drive pawl perpendicular to endpoint drive pawl

Page 17

July 2014

Advertising
This manual is related to the following products: