SAFETY INFORMATION

This water conditioner’s control valve conforms to UL/CE

Standards. Generic valves were tested and certified for

compliance as verified by the agency listing.

• Please review the entire Installation and Operation

Manual before installing the water conditioning system.

• As with all plumbing projects, it is recommended that

a trained professional water treatment dealer install

the water conditioning system. Please follow all local

plumbing codes for installing this water conditioning

system.

• This system will not make microbiologically unsafe water

safe. Water that is unsafe must be treated separately

from this conditioner.

• This water conditioning system is to be used only for

potable water.

• Inspect the water conditioning system for carrier shortage

or shipping damage before beginning installation.

• Use only lead-free solder and flux, as required by

federal and state codes, when installing soldered copper

plumbing.

• Use caution when installing soldered metal piping near

the water conditioning system. Heat can adversely affect

the plastic control valve and bypass valve.

• All plastic connections should be hand tightened. Teflon*

tape may be used on connections that do not use an

O-ring seal. Do not use pipe dope type sealants on the

valve body.

Do not use pliers or pipe wrenches.

• Do not use petroleum-based lubricants such as Vaseline,

oils or hydrocarbon-based lubricants. Use only 100%

silicone lubricants.

• Use only the power transformer supplied with this water

conditioning system.

• All electrical connections must be completed according to

local codes.

• The power outlet must be grounded
• Install an appropriate grounding strap across the inlet and

outlet piping of the water conditioning system to ensure

that a proper ground is maintained.

• To disconnect power, unplug the AC adapter from its

power source.

• Observe drain line requirements.
• Do not support the weight of the system on the control

valve fittings, plumbing, or the bypass.

• Do not allow this water conditioning system to freeze.

Damage from freezing will void this water conditioning

system’s warranty.

• Operating ambient temperature: 34° to 120°F (1° to

49°C).

• Operating water temperature: 34° to 100°F (1° to 38°C).
• Operating water pressure range : 20 to 120 psi (1.38

to 8.27 bar). In Canada the acceptable operating water

pressure range is 20 to 100 psi (1.38 to 6.89 bar).

• Observe all warnings that appear in this manual.
• Keep the media tank in the upright position. Do not turn

upside down or drop. Turning the tank upside down or

laying the tank on its side can cause media to enter the

valve.

• Use only regenerants designed for water conditioning. Do

not use ice melting salt, block salt or rock salt.

*Teflon is a trademark of E.I. duPont de Nemours.

HOW TO USE THIS MANUAL

This installation manual is designed to guide the installer

through the process of installing and starting water conditioning

systems featuring the 9100 TS controller.
This manual is a reference and will not include every system

installation situation. The person installing this equipment

should have:

• Training in the 9100 TS control and the 9000/9100 valve.
• Knowledge of water conditioning and how to determine

proper control settings.

• Adequate plumbing skills.

GENERAL AND COMMERCIAL

INSTALLATION INSTRUCTIONS

1. Place the softener tank where you want to install the unit.

NOTE: Be sure the tank is level and on a firm base.

2. During cold weather it is recommended that the installer

warm the valve to room temperature before operating.

3. Perform all plumbing according to local plumbing codes.

— Use a 1/2" minimum pipe size for the drain.

— Use a 3/4" drain line for backwash flow rates that exceed

7 gpm or length that exceeds 20' (6 m).

4. Both tanks must be the same height and diameter and filled

with equal amounts of media.

5. The distributor tube must be flush with the top of each tank.

Cut if necessary. Use only non-aerosol siliconelubricant.

6. Lubricate the distributor O-ring seal and tank O-ring seal.

Place the main control valve on one tank and the tank

adapter on the second tank.

NOTE: If required, solder copper tubing for tank

interconnection before assembling on the

main control valve and tank adapter. Maintain a

minimum of 1" distance between tanks on final

assembly.

7. Solder joints near the drain must be done before

connecting the Drain Line Flow Control fitting (DLFC).Leave

at least 6" (152 mm) between the DLFC and solder joints

when soldering pipes that are connected on the DLFC.

Failure to do this could cause interior damage to DLFC.

8. Use only Teflon tape on the drain fitting.
9. Be sure the floor under the salt storage tank is clean and

level.

10. Place approximately 1" (25 mm) of water above the grid

plate. If a grid is not utilized, fill to the top of the air check in

the salt tank. Do not add salt to the brine tank at this time.

11. On units with a bypass, place in Bypass position.

— Turn on the main water supply.

— Open a cold soft water tap nearby and let water run a

few minutes or until the system is free of foreign material

(usually solder) resulting from the installation. Close the

water tap when water runs clean.

12. Place the bypass In Service position and let water flow into

the mineral tank. When water flow stops, slowly open a cold

water tap nearby and let water run until air is purged from

the unit. Then close tap.

13. Make all electrical connections according to codes. Plug the

valve into an approved power source. Do not insert meter

cable into the meter yet.

14. Tank one has control valve and tank two has adapter.
15. Look on the right side of the control valve, it has indicators

showing which position the control valve is in during

Regeneration and which tank is In Service.