Install the primary pcie riser cage – HP ProLiant DL385p Gen8 Server User Manual

Page 31

Advertising
background image

Operations 31

5.

If a full-length expansion board is installed in slot 4, release the full-length expansion board retainer,

and then remove the PCIe riser cage.

To install the component, reverse the removal procedure.

Install the primary PCIe riser cage

WARNING:

To reduce the risk of personal injury, electric shock, or damage to the equipment,

remove the power cord to remove power from the server. The front panel Power On/Standby

button does not completely shut off system power. Portions of the power supply and some internal
circuitry remain active until AC power is removed.

1.

Power down the server (on page

23

).

2.

Remove all power:

a.

Disconnect each power cord from the power source.

b.

Disconnect each power cord from the server.

3.

Extend the server from the rack (on page

23

).

4.

Remove the access panel (on page

25

).

Advertising