10 faq – HP IMC Branch Intelligent Management Software User Manual

Page 62

Advertising
background image

10 FAQ

10.1

When the operator redirects the CPE from server A to server B for management, why is the
status of the CPE still reachable on server A?
This problem is caused by the CPE status polling policy of BIMS. To reduce the bandwidth
usage, BIMS determines whether a CPE is reachable by trying to connect to the CPE. After
the operator redirects the CPE on server A to server B for management, when server A tries
to connect to the CPE, the system returns the result “Success”, and server A considers the
CPE as reachable, only if the TR-069 function of the CPE is available.

62

FAQ

Advertising
This manual is related to the following products: