Installer: Complete unit and system checkout and follow unit start-up procedures in the IOM. Use this form to record
unit information, temperatures and pressures during start-up. Keep this form for future reference.

Job Name: ________________________________ Street Address: _____________________________________

Model Number: ____________________________ Serial Number: ______________________________________

Unit Location in Building: _______________________________________________________________________

Date: ________________________________ Sales Order No: __________________________________________

In order to minimize troubleshooting and costly system failures, complete the following checks and data entries before
the system is put into full operation.

Temperatures:

F

C

Pressures:

PSIG

kPa

Cooling Mode

Heating Mode

Entering Fluid Temperature

Leaving Fluid Temperature

Temperature Differential
Return-Air Temperature

DB

WB

DB

WB

Supply-Air Temperature

DB

WB

DB

WB

Temperature Differential

Water Coil Heat Exchanger
(Water Pressure IN)

Water Coil Heat Exchanger
(Water Pressure OUT)

Pressure Differential
Compressor
Amps
Volts
Discharge Line Temperature
(After 5 Minutes)
Motor
Amps

Volts

Do not connect gage lines

Start-up Sheet Log