4.4

Cable Management Bar (Optional Accessory)

Before installing the circuit breaker panel in the rack, determine if the optional cable management
bar was ordered for this panel. If so, install the bar before mounting the panel on the rack.

Use the following procedure:

1. Position the cable management bar at the rear of the panel as shown in

Figure 11

.

2. Secure the bar to the panel using the 0.25-inch (6.35 mm) long 4-40 screws supplied with

the cable management bar.

Figure 11. Cable Management Bar Installation

4.5

Mounting Panel on Rack

The circuit breaker panel can be mounted in either a 19- or 23-inch (48.26 or 58.42 cm) wide
rack using the 1.75-inch high (4.45 cm), 19- or 23-inch rack mounting brackets. The brackets,
mounting screws, and washers are provided with the panel.

Note: The cable management bar can be recess-mounted by using the mounting holes closest
to the front of the panel.

Caution: When attaching the cable management bar to the circuit breaker panel, use only the
hardware supplied with the cable management bar. Use of any other hardware could cause
contact with internal parts of the circuit breaker panel. If parts are missing, please contact ADC.

Note: A circuit breaker panel with the cable management bar attached may exceed the
12-inch (3.05 mm) overall depth objective described in GR-63 CORE, 02-14.

20645-A

CABLE

MANAGEMENT

BAR

ATTACH TO

EITHER SET
OF 3 HOLES

MOUNTING BRACKET

INSTALLED FOR

23-IN. (58.42 CM)

RACK MOUNTING

Advertising