Bard CH4S1 User Manual

Page 13

Advertising
background image

Manual 2100-455M

Page

13 of 28

FIGure 7

Wall mOuntInG InstructIOns

FIGure 8

Wall mOuntInG InstructIOns

flashing. Attach to

"CH" Unit

structural steel

steel siding wall

Exterior wood or

when framing wall to support unit.

Follow all local building codes

opening

Interior finished wall

Supply opening

Return

2x4's, 2x6's, and/or

Framing material:

unit before installing.

Factory supplied rain

!

MIS-2024 A

1" clearance

51 1/4"

1" clearance

9 13/16"

6 1/8"

15 7/8"

29 7/8"

3" MIN. TO OVER HANG OR EAVES

MIS-2025 A

CL

be required for some

Supply Opening

walls.

unit.

Return Opening

These structural

members must be

able to support the

entire weight of the

Locate stud to match

spacing for rest of wall.

A second member may

!

Follow all local building codes

when framing wall to support unit.

44 7/8"