Group test – Bad Boy Mowers BAD BOY 02.9812.0001C User Manual

Page 64

Advertising
background image

B

AD

B

OY

™ S

POT

L

UMINAIRE

U

SER

M

ANUAL

5 4

02.9812.0001C

Group Test

The Group Test menu allows multiple Bad Boy™ luminaires to be run through a configurable test
sequence when chained together via DMX512 or Ethernet. (Refer to

"Connecting Power and Data"

on

page 19 for more information about daisy-chaining.)
To perform a group test:
Step 1. At Group Test screen, select options to run: Pan/Tilt, Intensity, Colors, Gobos, and/or Zoom.
Step 2. Select test option: concurrently (all selected tests are run at once) or sequentially (tests are

run one at a time as each one finishes).

Step 3. Press START to begin testing. All Bad Boy luminaires connected to the main fixture (now

referred to as the "Master") will become "Slaves" and follow the test routine set on the
Master in an endless loop.

Step 4. To stop the test sequence, press STOP on the Master.
While in group test, a Master can manually change certain values by using the Manual Control screen.
From here, you can adjust the levels of parameters not active in the test sequence. For example, if a test
were running on gobos and colors, you can adjust the pan and tilt to point the Master and all Slaves to
a position where it will be easier see the output of the fixtures.

Advertising