3 automatic transfer operation, 4 sequence of automatic operation – Bryant ASPAS1BBA012 User Manual

Page 12

Advertising
background image

10 Bryant

2.3

AUTOMATIC TRANSFER
OPERATION

To select automatic operation, do the following:
1. Make sure the transfer switch main contacts are set

to their UTILITY position, i.e., loads connected to the

utility power source (Figure 2.2).

2. Be sure that normal UTILITY power source voltage is

available to transfer switch terminal lugs N1 and N2.

3. Set the generator’s AUTO/OFF/MANUAL switch to

AUTO.

4. Set the generator’s main circuit breaker to its ON (or

closed) position.

With the preceding steps complete, the generator will

start automatically when utility source voltage drops

below a preset level. After the unit starts, loads are

transferred to the standby power source. Refer to Section

2.4, “Sequence of Automatic Operation.”

2.3.1 12 VDC ACCESSORY OUTLET

Your generator is equipped with a 12 VDC accessory

outlet in the Generator Control Panel. (Figure 2.1) With

the generator running or in standby mode, this outlet may

be used to temporarily power low power accessories

such as a work light, cell phone, radio or any other

automotive style accessory. This outlet is capable of

delivering a MAXIMUM of 7.5 Amps. If the accessory to

be used through this circuit demands too much power,

the fuse that protects this circuit will melt open and the

circuit will not be functional.

This 12 VDC outlet draws power from the
generator's starting battery and extended use
of this outlet may drain the battery and the
engine may not start. This outlet should NOT
be used for battery charging.

2.3.2 120 VAC GFCI OUTLET

Your generator is equipped with an external, 15 amp, 120

volt, GFCI convenience outlet that is located in the right

rear of the generator enclosure. (Figures 1.1 and 1.2,

page 5) When the generator is running, in the absence of

utility power, this outlet may be used to power items

outside your home such as lights or power tools. This

outlet may also be used when utility power is present by

running the generator in manual mode. This oultlet does

not provide power if the generator is not running. This

outlet is protected by a 15-amp circuit breaker located in

the generator control panel. (Figure 3.1).

2.4

SEQUENCE OF AUTOMATIC
OPERATION

The generator’s control panel houses a control logic

circuit board. This board constantly monitors utility power

source voltage. Should that voltage drop below a preset

level, circuit board action will signal the engine to crank

and start. After the engine starts, the circuit board signals

the transfer switch to activate and connect load circuits to

the standby power supply (load terminal lugs T1/T2

connect to terminal lugs E1/E2).
Upon restoration of utility power supply, generator circuit

board action signals the transfer switch to transfer loads

back to the utility power supply. After retransfer, the

engine is signalled to shut down.
The actual sequence of operation is controlled by

sensors and timers on a control logic circuit board, as

follows:
A. Utility Voltage Dropout Sensor

• This sensor monitors utility source voltage.
• If utility source voltage drops below about 70 percent

of the nominal supply voltage, the sensor energizes

a 15-second timer.

• Once the timer has expired, the engine will crank and

start.

B. Engine Warm-up Time Delay

• This mechanism lets the engine warm up for about

10 seconds before the load is transferred to the

standby source.

C.Standby Voltage Sensor

• This sensor monitors generator AC output voltage.

When the voltage has reached 50 percent of the

nominal rated voltage, transfer to standby can occur.

D.Utility Voltage Pickup Sensor

• This sensor monitors utility power supply voltage.

When that voltage is restored above 70 percent of

the nominal source voltage, a retransfer time delay

starts timing.

E. Retransfer Time Delay

• This timer runs for about 15 seconds.
• At end of a 15-second delay, circuit board action de-

energizes transfer relay in the transfer switch.

• Retransfer to utility power source then occurs.

F. Engine Cool-down Timer

• When the load is transferred back to utility power

source, the engine cool-down timer starts timing.

• The timer will run for about one minute, and the

generator will then shut down.

‹

!

‹