Stacking 5. electrical connections – Bakers Pride VH1828E User Manual

Page 6

Advertising
background image

$

!

!

CAUTION: Normal cooking operations may result in the production of smoke or fumes and may

cause nausea and dizziness. Be sure the oven is placed in a well-ventilatedarea.

E.

Remove all loose parts and packages from the interior of the conveyor oven. The conveyor oven has

mounting. For further information on removal and mounting of interior panels, see Section 10,

cleaning.

(4) air-directing "plenum fingers" in the interior cooking chamber. Check these items for proper

4. STACKING

5. ELECTRICAL CONNECTIONS

General Instructions
a

e) Only a licensed electrician should make the electrical connections.

f) Proper connections are shown on the wiring diagrams as well as the rating plate.

g) Wiring diagrams are located in the control box containing the Main Switch (green rocker).

h) When installed, the unit must be electrically grounded in accordance with the local codes and/or the

latest edition of the national Electrical Code ANSI/NFPA No. 70 in the USA or Canadian Electrical

Code, CSA Standard C22.1, Part 1 in Canada.

) Only use copper conductor wires rated at 90°C suitably sized for the electric current drawn.

d) Make sure the electrical supply corresponds with that specified on the rating plate.

b) Dual Air Model 1828E ovens are constructed for permanent connections - no power cord is supplied.

c) Dual Air Model 1620E ovens are supplied with a flexible power cord and plug.

Your conveyor oven(s) can be

stacked up to (3) high. Each unit is

built exactly the same, so it does not

matter in which order they are

stacked. For stacking of (2) units,

remove the legs from the second

(upper) unit prior to mounting on top

of the bottom unit. For stacking of (3)

units, it is preferable to use a

"stacking kit", which allows all

conveyor ovens to be supported by

an external framework, such as a

table,

with each conveyor oven

having all legs removed.

"CAUTION: If you use a multiple stack

assembly, remember that each oven has

its own power disconnect. Make sure

ALL main switches are OFF before any

cleaning or maintenanceis performed.”

1. Remove two bottom screws from the top oven rear panel.

2. Remove two top screws from the bottom oven rear panel.

3. Install the right and left stacking brackets as shown in above diagram.

4. Reinstall the four removed screws.

When

stacking,

remove

legs from

upper unit.

When stacking,

align “Dimpled

Foot” of upper

unit into

matching

“Dimple” of

bottom unit.

Use

Stacking

Brackets

to secure

ovens

together.

EACH CONVEYOR OVEN REQUIRES A SEPARATE CONNECTION

200-208

1

31

31

N/A

200-208

1

60

60

N/A

220

1

29

29

N/A

220

1

56

56

N/A

230

1

28

28

N/A

230

1

54

54

N/A

240

1

27

27

N/A

240

1

52

52

N/A

200-208

3

14

21

19

200-208

3

27

40

38

220

3

13

18

17

220

3

25

38

36

230

3

12

17

16

230

3

24

36

34

240

3

12

18

17

240

3

23

35

33

VH-, VHVA1620E: POWER SUPPLY (EACH) 6.4 KW/Hr

VH-, VHVA1828E: POWER SUPPLY (EACH) 12.4 KW/Hr

Volts

Phase

L1

L2

L3

Volts

Phase

L1

L2

L3

Advertising
This manual is related to the following products: