JLG 400CRT ANSI Service Manual User Manual

Page 42

Advertising
background image

SECTION 2 - PROCEDURES

2-28

– JLG Lift –

3121111

Table 2-6. Preventive Maintenance and Safety Inspection

AREA

INTERVAL

10Hours

(Daily)

50 Hours

(Weekly)

200 Hours

(Monthly)

500 Hours

(3 Month)

1000 Hours

(6 Month)

PLATFORM

1. Controller

1,11

2. Switches

1,11

3. Placards and Decals

1,2

4. Control Tags

1,2

5. Hoses and Cables

4,8

6. Wear Pads

8

7. Handrails and Chains

1,4

CHASSIS

1. Engine Oil

3

5

2. Battery

3

5

3. Air Cleaner

1

14

4. Exhaust System

1

1,5

5. Engine Mounts

1

6. Hydraulic Pump

1

5

7. Valves

1

5

8. Hydraulic Filter (See Lubrication Chart)

5,14

14

9. Hydraulic Hoses and Tubing

1

5

10. Hydraulic Oil Tank*

3

5

4

11. Hydraulic Tank Breather

6,14

12. Fuel Tank

3,5

4

13. Lift Cylinder

1,12

5,6,13

4

14. Limit Switch

1,7

15. Tilt Alarm Switch

1,7

16. Placards and Decals

1,2

17. Wheel and Tire Assemblies

1

8,9

18. Drive Motors

1,5,6

19. Drive Brakes

1,6

8

20. Drive Torque Hubs

1,3,5,6

21. Steer Cylinder

1

5,6,13

4

22. Steer Components

1

4,6

8

23. Wheel Bearings (2 Wheel Drive)

8

12

24. Sizzor Arms

1,4

25. Safety Props

1,4

26. Sliding Wear Pads

8

27. Pivot Pins/Bolts

1,4

7,8

28. Switches, Ground Control

1,11

29. Control Tags

1,2

* Inspection and Maintenance code 10 to be performed annually

Advertising
This manual is related to the following products: