Sequencing cable adjustment, Mast side profile mast chain/cable adjusters – JLG 20VP (3120728) Service Manual User Manual

Page 55

Advertising
background image

SECTION 2 - SERVICE PROCEDURES

3120728

– JLG Lift –

2-37

9.

Once mast section adjustment is completed, apply
loctite #242 to the threads under the (jam) nuts that
were loosened. Then re-tighten the loosened (jam)
nuts until tight against the top (adjust) nut. Chain/
cable should have slight tension but should not be
taut.

Sequencing Cable Adjustment

1.

Retract mast completely, and check each sequenc-
ing cable on outside of masts for excessive slack.
Adjust only to remove slack from cable.

2.

Tighten nylock-nut just enough to remove excessive
slack from sequencing cable. The springs should
not be compressed more than 25% after adjusting.

3.

Run mast through several cycles to verify cable/
chain adjustments and ensure no interference exists
between chain anchor brackets and mast.

Figure 2-22. Mast Chain/Cable/Sequence Cable Adjustment Components.

SECTION-1

FIXED

TO BASE

SEQUENCE CABLE

ADJUST NUT

MAST COVER

SHOWN REMOVED

SECTION-2

EXTENDED BY

CYLINDER

SECTION-5

(PLATFORM

HEADER SECTION)

EXTENDED BY

CHAIN/CABLE

CHAIN/CABLE

ANCHOR PLATE

ADJUST NUT

JAM NUT

THREADED

CHAIN/CABLE

END

Note: When

pply Loctite #242 to the

threads under the jam nut.

.

chain adjustment

is complete, before

tightening the jam nut

against the adjust nut,

a

SECTION-4

EXTENDED BY

CHAIN/CABLE

SECTION-3

EXTENDED BY

CHAIN

ADJUST UNTIL TOPS OF MAST

SECTIONS ARE EVEN

MAST SIDE PROFILE

MAST CHAIN/CABLE ADJUSTERS

Advertising