6 operation, Caution, Warning – Tsurumi PU Submersible Vortex Sewage Pump User Manual

Page 13: 1 non-automatic operation

Advertising
background image

-12-

Prior to Operation

(1) Once again, check the nameplate of the pump to verify that its voltage and frequency

are correct.

CAUTION

Improper voltage and frequency of the power supply will prevent the pump

from attaining its full potential, and may also damage the pump.

Note:

Verify the specs on the pump's nameplate.

(2) Check the wiring, power supply voltage, the capacity of the ground leakage circuit

breaker, and the insulation resistance of the motor.

Insulation resistance reference value = 20MΩ minimum

Note:

The insulation resistance reference value of 20MΩ minimum is based on a new or repaired

pump. For reference values of a pump that has already been put into operation, refer to

"Maintenance and Inspection".

(3) Adjust the setting of the thermal relay (i.e. 3E relay) to the pump's rated current.

Note:

Verify the rated current on the pump's nameplate.

6-1 NON-AUTOMATIC OPERATION

Trial Operation

WARNING

Never start the pump while it is suspended, as the pump may jerk and cause

a serious accident involving injury.

(1) Operate the pump for a short time (1 to 2 seconds) and verify the direction of the rota-

tion of the impeller. Observe the pump unit from above, and if its recoil is in the coun-

terclockwise direction, the direction of its rotation is correct.

CAUTION

Make sure to check the pump's direction of rotation with the pump exposed

to the atmosphere. Operating the pump in reverse while it is submerged in

water will damage the pump, which may lead to current leakage and electrical

shock.

(2) To reverse the rotation, the following countermeasures must be taken.

WARNING

Before changing the connections for reverse

rotation, make sure that the power supply

(i.e. circuit breaker) is properly disconnected

and that the impeller has stopped

completely. Failure to observe this may lead

to electrical shock, short, or injury.

COUNTERMEASURE

Direct-on-line starting

Interchange any two of the three wires designated U, V, and W,

respectively.

Example:

U

V

W

G

Interchanging

phases V and W

6 OPERATION

Advertising