Caution, 2 automatic operation – Tsurumi PU Submersible Vortex Sewage Pump User Manual

Page 15

Advertising
background image

-14-

6-2 Automatic Operation

Trial Operation

Equipped with floats to detect the water level and an internal control circuit, the automatic

type (PUA, PNA, PSFA, TMA) pump can perform an automatic drainage operation alone by

merely connecting its cable to a power supply.

Connect the power and perform a trial operation as follows:

Note:

Allow the pump to operate a minimum of 2 seconds for each trial operation. The trial op-

eration must be completed within 1 minute.

CAUTION

In case the pump exhibits an abnormal condition (such as a considerable

amount of vibration, noise, or smell), disconnect the power supply

immediately and contact the dealer where you purchased the equipment, or

Tsurumi's sales office in your area. If the pump continues to be used in the

abnormal state, it may cause current leakage, electrical shock, or fire.

(1) Direct all the floats downward.

(2) First raise the (red) stop float, then the (yellow) start

float. This will cause the pump to start.

(3) Next, return the (yellow) start float, and then the (red)

stop float to their original positions. This will cause the

pump to stop.

(4) Perform steps (2) and (3) consecutively two or more

times to verify the operation.

Check float switch operation

Move

Float Switch

A Type

B Type

Note:

The trial operation must be completed within 1 minute.

CAUTION

In case the pump exhibits an abnormal condition (such as a considerable

amount of vibration, noise, or smell), disconnect the power supply

immediately and contact the dealer where you purchased the equipment, or

Tsurumi's sales office in your area. If the pump continues to be used in the

abnormal state, it may cause current leakage, electrical shock, or fire.

Equipped with floats to detect the water level the automatic type (PUZ, PNZ, PSFZ) pump can

perform an automatic drainage operation alone by merely connecting its cable to a power

supply.

Connect the power and perform a trial operation as follows:
(1) Direct all the floats downward.

(2) Raise the (yellow) float. This will cause the pump to

start.

(3) Next, return the (yellow) float to their original posi-

tions. This will cause the pump to stop.

(4) Perform steps (2) and (3) consecutively two or

more times to verify the operation.

Check float switch operation

Move

Float Switch

Advertising