Environmental Express SPE-Express with Cover User Manual

Page 30

Advertising
background image

SPE-­‐Express  Operation  and  Instruction  Manual  

 

 

www.envexp.com

         

 

 

29  

3.2.2

Flushing a Station

Press “Flush Station”.

Once “Flush Station” is pressed, a prompt will appear. Press the radio buttons to confirm that the
following steps have been completed:

o Install a new filter disk
o Install a clean, empty sample bottle
o Ensure that the bottle assembly is latched in the upright position.
o Ensure an aluminum evaporating pan is on the heater block (Note: there is no need to pre-

weigh to pan)

o Remove the spring clamp and place the sliding glass chamber into the down position
o Install a new drying cartridge

Press “Next”.

Once “Next” is pressed, a prompt will appear. Press the radio buttons to confirm the following steps
have been completed:

o Raise sliding glass chamber into upper position
o Ensure that the sliding glass chamber is properly sealed (Note: after “Next” is pushed, vacuum

pressure is applied to the chamber to help seal the glass chambers together)

o Install spring clamp after seal is made
o Ensure door is closed

Press “Ready” <Enter>. The system flush will begin.

Press “Back” <F1> to turn off the vacuum and return to previous prompt prior to beginning the flush

Advertising