SPE-­‐Express  Operation  and  Instruction  Manual  

 

 

www.envexp.com

         

 

 

33  

o Raise sliding glass chamber into upper position.
o Ensure that the sliding glass chamber is properly sealed.
o Install spring clamp after seal is made.
o Ensure doors are closed.

Press “Ready” to continue the second test.

Press the “Abort Test Station” button to stop all procedures within the station and to remove power
from all station components.

Press the “Abort All” <End> button to stop all three station procedures and to remove power from all
three station components.

3.4 Operating Multiple Stations

All three stations may be run simultaneously by toggling between the designated station tabs in the left hand
corner of the Operator Test Screen.
The software requires that the user acknowledge any prompt appearing while running station procedures prior to
returning to the Operator Test screen.

3.5 Operating Two Units

All six stations may be run simultaneously by toggling between the designated station tabs in the left hand corner of
the Operator Test Screen. Unit 1 will always be the unit on the left and unit 2 will be the unit on the right. The
stations in unit 1 will retain the identification numbers 1-3 while the stations in unit 2 will be reassigned as stations
4-6.