Mise en route / start-up / inbetriebsetzung – Sulky VISION 2 WPB User Manual

Page 43

Advertising
background image

43

GB

Mise en route / Start-up / Inbetriebsetzung

1

1

Select the EPAN menu

2

2

Check that: • the fertiliser selection is correct,

• hydraulic shutters are closed,
• the correction mode is correct (Dynamic or Static).

3

3

Select the dose/ha:
use the numeric pad directly, validate by

.

4

4

Start spreading and select the correction (Test or Auto).

5

5

You are spreading in DPA mode.
You can modulate the dose/ha: select

or

and return to baseline flow rate by selecting

.

6

6

You can start the TRIBORD or select

to modulate the RH side or select

to modulate

the LH side.

Return to the same the same left/right dose by selecting

.

1

1

Select the INFO menu.

2

2

Select the PAR/TOT mode.

3

3

Reset each counter to zero with the RAZ function.

4

4

As soon as you hear an alarm sound or see a bell appear on the screen, select

to determine the cause[s].

Select OK to return to the baseline menu.

5

5

Select

to save.

A

B

C

1

1

Select the REG menu.

2

2

Make sure that all parameters are correctly entered and saved : rate coefficient
and working width .

3

3

Select your weighing method

.

4

4

Select TARE and reset it to zero.

5

5

Select your fertilisers

.

1

3

Advertising