Mise en route start-up inbetriebsetzung – Sulky VISION 2 DPB User Manual

Page 37

Advertising
background image

1

1

Select the EPAN menu

2

2

Check that: • the fertiliser selection is correct,

• the hydraulic shutters are closed.

3

3

Select

and carry out the stationary test.

4

4

Select the application rate/ha:

use the numeric pad and confirm by pressing

.

5

5

You are spreading in DPA mode.

You can adjust the application rate/ha: select

or

and return to baseline flow rate by selecting

.

6

6

You can start the TRIBORD or select

to adjust the RH side or select

to adjust the LH side.

Return to the same left/right application rate by selecting

.

37

Mise en route

Start-up

Inbetriebsetzung

1

1

Select the REG menu.

2

2

Make sure that all parameters are correctly entered and saved: rate coefficient

and working width

.

3

3

Select your fertilisers

.

A

1

1

Select the INFO menu.

2

2

Select the PAR/TOT mode.

3

3

Reset each counter to zero with the RAZ function.

4

4

As soon as you hear an alarm sound or see a bell appear on the screen, select

to determine the cause[s].

Select OK to return to the baseline menu.

5

5

Select

to save.

B

C

GB

Advertising