Informations, Information informationen – Sulky VISION 2 DPB User Manual

Page 49

Advertising
background image

49

Informations

E

Information

Informationen

GB

Problems - Solutions

Problems

Solutions

The unit does not switch on

Check

- unit/power supply connections
- power cable fuses

Calibration test

Check

- calibration factor
- shutters are closed

Repeat the stationary test.

Shutters open to maximum then to minimum

Check

- Tractor forward speed coefficient
- spreading width
(24.00 - note the position of the decimal point)

The unit switches on but the actuators do not move

Check

- Fuses

The area meter reading is incorrect

Check

- connection / machine
- working width
- forward speed

Flow rate

Check

- programmed flow rate
- fertiliser coefficient
- PTO speed = 540 rpm
- spreading width
- tractor’s forward speed
- shutter opening/closing performance
- actuator travel
- tramlining

The forward speed rate is incorrect

Check

- connection on unit
- sensor magnet clearance
- magnet rotation
- sensor wire continuity

(resistance 100 ± 10)

- 100-m coefficient

The tonnage counter reading is incorrect

Check

- connection / machine
- working width
- forward speed
- fertiliser coefficient
- shutter opening/closing

Advertising