Rockwell Automation Publication 1608M-UM004A-EN-P - April 2014

11

Installation

Chapter 2

Figure 3 - Floor Mounting Detail

Electrical Interconnections

The MegaDySC Module is shipped separately from the Automatic Bypass
Switchboard and the ER Module. The customer is responsible for system
mounting and electrical supply and load connections. All interconnecting bus
bars and power cables are provided and will be connected by a factory-trained
technician during commissioning. At commissioning the bus links will be
connected between the Automatic Bypass Switchboard and the MegaDySC
Module. A control wiring cable is also provided in the Automatic Bypass
Switchboard and must be connected to the MegaDySC Module. This control
cable is routed through two large holes, one in the Automatic Bypass
Switchboard and one in the MegaDySC Module, located at the bottom front of
the enclosures. The cable is plugged into the associated terminal block located in
the lower, left corner of the MegaDySC Module. Two other cable harnesses are
routed between the MegaDySC Module and the ER Module.

;








 




 




 





 





 









































































































Required Anchor Locations

WARNING: Equipment must be earth-grounded according to local and
national electric codes. Failure to supply proper equipment grounding may
result in electrical shock or death.