6 seismic protection – Trebor Quantum Series Di Water Heater User Manual

Page 12

Advertising
background image

PAGE 12

QUANTUM DI HEATER OPERATION / MAINTENANCE MANUAL

2.5.f Machine Start-Up with door open

Perform the following sequence of events in the order listed for electrical
re-energization of the tool:

1. Ensure that all hand tools are removed from the equipment and that it

is ready for start-up.

2. Notify personnel in the area that you are going to start-up the

equipment.

3. Insert and rotate the key in the rotary disconnect lock (top left of

rotary disconnect device). Remove the key.

4. Move the rotary disconnect shaft to the "ON" of “1” (up) position.

5. Press the machine start button. The machine should start.

2.6 SEISMIC PROTECTION

It is the

user’s responsibility to adequately secure and anchor the

equipment to comply with local regulatory agency seismic requirements.
Mechanical anchors are provided using seismic brackets attached to the
bottom of the cabinet enclosure. See Facility Layout in Appendix for
bracket location.

Advertising