Ultra-cut 400 xt – Tweco 400 XT Ultra-Cut Plasma Cutting System User Manual

Page 46

Advertising
background image

ULTRA-CUT 400 XT

3-24

INSTALLATION

Manual 0-5275

Match the colors of the hoses to the front panel label. Supply lines are green and return lines are red. Facing the unit as shown

below, the left connections go to the Ultra-Cut XT™ power supply, the right connections go to the RAS1000 arc starter.

CAUTION

Do NOT cross the coolant lines as this will not provide cooling for the XT™ plasma torch as designed and void the

warranty.

Attach and tighten all #6 JIC fittings with 11/16” (18mm) wrench. Do not overtighten as it will strip the fitting threads and will

cause a leak. Do not start the Ultra-Cut XT™ without coolant in the reservoir. An additional gallon (3.78l) of coolant is required

to compensate for the HE400 being attached to the system. Monitor the fluid level while filling the Ultra-Cut XT. Do not allow the

coolant reservoir level to drop below minimum.

Attach the J71 cable after the Cooler and coolant lines have been determined to be leak free.

Art # A-09624_A

B

Under low power plasma cutting the HE400 may not come on. This is normal operation.

Periodically check obstructions in the radiator and remove them by vacuuming the fins. Do not use cleaners or fluids to remove

debris, they may affect the radiator integrity.

Advertising